presentation of Company
create your floor
some projects carried out with our products
contact us by e-mail
technical informations
reserved area
 

back to Home Page



 

Instruction for use
When you obtain a uniform paste, spread it on the floor-foundation. Glue must be trowelled on the substrate in such a way as to incorporate all dust. Use the adhesive in small spaces every time, because before the glue has made a superficial skin, you have to lay the wooden elements on the glue bed, making sure that all the surface is covered by glue. Apply a strong pressure over the pieces just laid down to ensure the complete contact with the skin of glue. Glue will have to be placed also on the front of short strips and not on the sides, which must be clean, degreased, dry, sound and free from detached parts, wax and other similar substances. Where the substrate meets the wall, expansion joints should be present in all large rooms. Don’t walk on the new floor at least in the first 6-8 hours, until the adhesive starts drying. Clean immediately the dirty tools with a solvent. Since the adhesive dries completely within 24-48 hours after laying, it’s possible to remove it only using appropriate tools.

Safety advices
Read carefully the informations about the security of this product before using it. Follow anyway the current security laws during the application. Be sure to guarantee an adequate ventilation of the rooms during installation; we suggest the application of a protective cream for hands.

* Check anyway the technical bulletin
** This product can be used only by professional men


 

Aliparquets | Catalogue | Virtual floors | Projects | Contact | Technical info | News

 

Questo sito è realizzato da : © SIDIC sa - Tutti i diritti riservati